| Construction & demolition | $60.00 per tonConstruction / demolition as defined per IC 39-7403(10). Proof of source must be provided (copy of building permit, site address). At non-scaled sites, attendants shall use the U.S. EPA's "Volume-to-Weight Conversion Factors" table for calculating fees. Asbestos will not be accepted. No out of county construction / demolition will be accepted. |
| Yard waste | $5.00 per tonGrass, leaves, tree limbs, etc. |
| Concrete | $60.00 per tonAsphalt is charged at the same rate. Concrete containing metal will not be accepted. Proof of source must be provided (copy of building permit, site address). No out of county construction / demolition will be accepted. |
| Concrete, broken to under 8 inches | $30.00 per tonAsphalt is charged at the same rate. Concrete containing metal will not be accepted. Proof of source must be provided (copy of building permit, site address). No out of county construction / demolition will be accepted. |
| Tires | $400.00 per ton |
| Agricultural waste | $30.00 per tonAs defined per IC 39-7403(2). |
| Animal parts, processed | $30.00 per ton |
| Mixed load | $120.00 per tonLoad containing multiple types of waste. |